Contract Ledger
Every disclosed AI compute, colocation, hosting, power and equipment contract, one row per disclosure, read from the SEC filing it appeared in. Nulls mean the filing did not say. Nothing is estimated.
Contracts
7
7 from filings
Disclosed value
$7.78B
sum of stated totals, live
Capacity
810 MW
sum of stated MW, live
GPUs
—
where a count was stated
Providers
2
parties delivering
Latest filing
Jun 9, 2026
most recent disclosure
Customer concentration · by provider · top 8
Applied Digital5 contracts
$7.60B · 610 MWtop customer 68%
- Undisclosed$5.20B
- Base Electron, Inc.$2.40B
- Oracle200 MW
- a U.S.-Based Investment Grade Hyperscaler200 MW
Macquarie Equipment Capital, Inc.2 contracts
$175.00M · 200 MWtop customer 57%
- APLD DevCo LLC$100.00M
- APLD FAR-01 LLC$75.00M
Disclosures · 7
| Filed | Provider | Customer | Kind | Site | MW | GPUs | Term | Total value | Annual | Status | Source |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Jun 9, 2026 | Applied Digital | Undisclosed (CoreWeave) | Colocation lease | Polaris Forge 1, Building 3 | — | — | — | — | — | Amendedverified | 8-K |
excerptApplied Digital also entered into a Memorandum of Understanding with CoreWeave on June 5, 2026, to assign the lease with CoreWeave for Building 3 at the Polaris Forge 1 campus to a CoreWeave subsidiary, if that subsidiary achieves an investment grade credit rating.Report an issue with this row | |||||||||||
| Jun 9, 2026 | Applied Digital Corporation | Undisclosed (U.S. based high investment-grade hyperscaler) | Colocation lease | Delta Forge 2 Campus | 210 MW | — | 15 yr | $5.20B | — | Amendedverified | 8-K |
excerpt · extension termsThe agreement covers 210 MW of critical IT load under a 15-year take-or-pay structure with renewal options, representing approximately $5.2 billion in base-term contracted revenue, or approximately $12.7 billion if all renewal options are exercised over a 30-year total term. Extension: Renewal options; total term up to 30 years with total revenue ~$12.7B Report an issue with this row | |||||||||||
| Mar 10, 2026 | Applied Digital | Oracle | Power supply | Polaris Forge 2, Harwood, North Dakota | 200 MW | — | — | — | — | Amendedverified | 8-K |
excerptThe Issuer intends to use the net proceeds from the offering to fund the development and construction of 200 megawatts of critical IT load at Polaris Forge 2, its AI Factory campus in Harwood, North Dakota currently leased to OracleReport an issue with this row | |||||||||||
| Mar 4, 2026 | Applied Digital Corporation | Base Electron, Inc. backstop: Applied Digital Corporation | Financing | — | — | — | — | $2.40B | $2.40B | Amendedverified | 8-K |
excerptIn connection with and as partial consideration for the Company’s entry into the Guarantee, Base Electron has agreed to issue to Applied Digital 10% of Base Electron’s outstanding equity. ... Applied Digital’s maximum potential exposure under the Guarantee is effectively limited by the obligations of Base Electron under the Design-Build Agreement, which provides for an anticipated total contract price of approximately $2.4 billion, subject to Applied Digital’s right to limit those obligations by terminating the Guarantee under the circumstances set forth in Item 1.01 of this Current Report on Form 8-K. ... the payment by the Company of a termination fee equal to either $50 million (if paid by August 1, 2026 and Base Electron is current in its payments to B&W) or $100 million.Report an issue with this row | |||||||||||
| Dec 22, 2025 | Macquarie Equipment Capital, Inc. | APLD DevCo LLC backstop: Applied Digital Corporation | Financing | — | — | — | — | $100.00M | — | Definitiveverified | 8-K |
excerpt · extension termsAPLD DevCo LLC, a Delaware limited liability company (the “Company”) hereby unconditionally promises to pay to Macquarie Equipment Capital, Inc. ... the principal sum of (a) FORTY FIVE MILLION DOLLARS ($45,000,000.00) ... plus (b) FIFTY FIVE MILLION DOLLARS ($55,000,000.00) ... (the “Initial Loan”) ... The Loan matures on the earliest of (i) the date of acceleration of the Loan, (ii) July 18, 2026, to the extent the Initial Lease Execution (as defined therein) has not occurred on or before April 18, 2026, or (iii) December 18, 2027 (the “Maturity Date”). Extension: Uncommitted Additional Loans and Rollover Loans for new or existing data center projects at Lender's sole discretion; DevCo Facility terminates no later than December 18, 2027. Report an issue with this row | |||||||||||
| Nov 12, 2025 | Applied Digital | a U.S.-Based Investment Grade Hyperscaler | Colocation lease | Polaris Forge 2 campus, Harwood, North Dakota | 200 MW | — | — | — | — | Amendedverified | 8-K |
excerpt · extension termsThe Polaris Forge 2 campus has leased 200 MW of critical IT capacity, currently under construction, to a U.S.-Based Investment Grade Hyperscaler, which also holds the first right of refusal for an additional 800 MW of critical IT load at that campus Extension: First right of refusal for an additional 800 MW of critical IT load at the same campus. Report an issue with this row | |||||||||||
| Sep 12, 2025 | Macquarie Equipment Capital, Inc. | APLD FAR-01 LLC backstop: Applied Digital Corporation | Financing | Polaris Forge 2, Harwood, ND | 200 MW | — | — | $75.00M | — | Amendedverified | 8-K |
excerptThe Promissory Note provides for a principal sum of (a) $50 million (the “Initial Loan”), which was drawn on the Closing Date, plus (b) subject to the mutual consent of the Borrower and the Lender, additional loans in an aggregate principal amount not to exceed $25 million (the “Additional Loans” and together with the Initial Loan, the “Loan”). ... Proceeds of the Loan under the Promissory Note will be used, in part, to ... (iii) fund the purchase of the financed properties located on the Company’s campus in Harwood, ND (“Polaris Forge 2”), including all associated closing costs, title fees, and legal expenses, (iv) finance improvements to the Polaris Forge 2 properties, (v) fund the purchase of the Transformers (as defined therein) and other equipment expected to be installed and used forReport an issue with this row | |||||||||||
Rows marked auto were extracted by a model and not yet reviewed; the excerpt under each row is the verbatim passage the figures came from. Confidence is the extractor's own estimate.