Contract Ledger
Every disclosed AI compute, colocation, hosting, power and equipment contract, one row per disclosure, read from the SEC filing it appeared in. Nulls mean the filing did not say. Nothing is estimated.
Contracts
9
9 from filings
Disclosed value
$18.60B
sum of stated totals, live
Capacity
1.11 GW
sum of stated MW, live
GPUs
—
where a count was stated
Providers
4
parties delivering
Latest filing
Jun 9, 2026
most recent disclosure
Customer concentration · by provider · filtered
Applied Digital5 contracts
$7.60B · 610 MWtop customer 68%
- Undisclosed$5.20B
- Base Electron, Inc.$2.40B
- Oracle200 MW
- a U.S.-Based Investment Grade Hyperscaler200 MW
Disclosures · 9
| Filed | Provider | Customer | Kind | Site | MW | GPUs | Term | Total value | Annual | Status | Source |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Jun 9, 2026 | Applied Digital | Undisclosed (CoreWeave) | Colocation lease | Polaris Forge 1, Building 3 | — | — | — | — | — | Amendedverified | 8-K |
excerptApplied Digital also entered into a Memorandum of Understanding with CoreWeave on June 5, 2026, to assign the lease with CoreWeave for Building 3 at the Polaris Forge 1 campus to a CoreWeave subsidiary, if that subsidiary achieves an investment grade credit rating.Report an issue with this row | |||||||||||
| Jun 9, 2026 | Applied Digital Corporation | Undisclosed (U.S. based high investment-grade hyperscaler) | Colocation lease | Delta Forge 2 Campus | 210 MW | — | 15 yr | $5.20B | — | Amendedverified | 8-K |
excerpt · extension termsThe agreement covers 210 MW of critical IT load under a 15-year take-or-pay structure with renewal options, representing approximately $5.2 billion in base-term contracted revenue, or approximately $12.7 billion if all renewal options are exercised over a 30-year total term. Extension: Renewal options; total term up to 30 years with total revenue ~$12.7B Report an issue with this row | |||||||||||
| Mar 10, 2026 | Applied Digital | Oracle | Power supply | Polaris Forge 2, Harwood, North Dakota | 200 MW | — | — | — | — | Amendedverified | 8-K |
excerptThe Issuer intends to use the net proceeds from the offering to fund the development and construction of 200 megawatts of critical IT load at Polaris Forge 2, its AI Factory campus in Harwood, North Dakota currently leased to OracleReport an issue with this row | |||||||||||
| Mar 4, 2026 | Applied Digital Corporation | Base Electron, Inc. backstop: Applied Digital Corporation | Financing | — | — | — | — | $2.40B | $2.40B | Amendedverified | 8-K |
excerptIn connection with and as partial consideration for the Company’s entry into the Guarantee, Base Electron has agreed to issue to Applied Digital 10% of Base Electron’s outstanding equity. ... Applied Digital’s maximum potential exposure under the Guarantee is effectively limited by the obligations of Base Electron under the Design-Build Agreement, which provides for an anticipated total contract price of approximately $2.4 billion, subject to Applied Digital’s right to limit those obligations by terminating the Guarantee under the circumstances set forth in Item 1.01 of this Current Report on Form 8-K. ... the payment by the Company of a termination fee equal to either $50 million (if paid by August 1, 2026 and Base Electron is current in its payments to B&W) or $100 million.Report an issue with this row | |||||||||||
| Nov 12, 2025 | Applied Digital | a U.S.-Based Investment Grade Hyperscaler | Colocation lease | Polaris Forge 2 campus, Harwood, North Dakota | 200 MW | — | — | — | — | Amendedverified | 8-K |
excerpt · extension termsThe Polaris Forge 2 campus has leased 200 MW of critical IT capacity, currently under construction, to a U.S.-Based Investment Grade Hyperscaler, which also holds the first right of refusal for an additional 800 MW of critical IT load at that campus Extension: First right of refusal for an additional 800 MW of critical IT load at the same campus. Report an issue with this row | |||||||||||
| Oct 9, 2025 | APLD ELN-02 LLC | Coreweave, Inc. | Colocation lease | 9663 87th Avenue SE, Ellendale, ND (Polaris Forge 1, ELN Building 02) | 100 MW | — | — | — | — | Amendedverified | 8-K |
excerpt"Coreweave Building 2 Lease" means that certain Datacenter Lease for the property located at 9663 87th Avenue SE, Ellendale, ND, dated as of May 28, 2025, by and between APLD ELN-02 LLC, a Delaware limited liability company, as landlord, and Coreweave, Inc., a Delaware corporation, as tenant. ... the Company's previously disclosed lease with a hyperscaler for the first 100 MW data center located at the Company's 400 MW Ellendale, North Dakota datacenter campus ("Polaris Forge 1")Report an issue with this row | |||||||||||
| Aug 29, 2025 | APLD ELN-02 C LLC | CoreWeave, Inc. | Colocation lease | Polaris Forge 1 Campus, Ellendale, North Dakota | 150 MW | — | 15 yr | $4.00B | — | Amendedverified | 8-K |
excerpton August 28, 2025, APLD ELN-02 C LLC, a subsidiary of the Company, ... Forge 1 (“Building 4”), a 150MW data center to be constructed by the Company. ... The total contract value for the initial approximately fifteen (15)-year term of the Building 4 Lease is expected to be approximately $4.0 billion.Report an issue with this row | |||||||||||
| Jun 2, 2025 | APLD ELN-02 LLC | CoreWeave, Inc. | Colocation lease | Ellendale Campus, North Dakota (Building 2) | 100 MW | — | 15 yr | $3.00B | — | Definitiveverified | 8-K |
excerpt · extension termsOn May 28, 2025, APLD ELN-02 LLC and APLD ELN-03 LLC ... each entered into a datacenter lease ... with CoreWeave, Inc. ... The first lease is for the full capacity of Building 2, the Company’s 100MW data center that is currently under construction (“Building 2”) ... The total contract value, for the initial approximately fifteen (15)-year term, (i) for the Building 2 Datacenter Lease is expected to be approximately $3 billion Extension: Three 5-year extension options. Report an issue with this row | |||||||||||
| Jun 2, 2025 | APLD ELN-03 LLC | CoreWeave, Inc. | Colocation lease | Ellendale Campus, North Dakota (Building 3) | 150 MW | — | 15 yr | $4.00B | — | Definitiveverified | 8-K |
excerpt · extension termsOn May 28, 2025, APLD ELN-02 LLC and APLD ELN-03 LLC ... each entered into a datacenter lease ... with CoreWeave, Inc. ... The second lease is for the full capacity of Building 3, a 150MW data center that is also under construction (“Building 3”) ... The total contract value, for the initial approximately fifteen (15)-year term ... (ii) for the Building 3 Datacenter Lease is expected to be approximately $4 billion Extension: Three 5-year extension options. Report an issue with this row | |||||||||||
Rows marked auto were extracted by a model and not yet reviewed; the excerpt under each row is the verbatim passage the figures came from. Confidence is the extractor's own estimate.