Contract Ledger

Every disclosed AI compute, colocation, hosting, power and equipment contract, one row per disclosure, read from the SEC filing it appeared in. Nulls mean the filing did not say. Nothing is estimated.

Contracts
5
5 from filings
Disclosed value
$0
sum of stated totals, live
Capacity
248 MW
sum of stated MW, live
GPUs
576
where a count was stated
Providers
1
parties delivering
Latest filing
May 18, 2026
most recent disclosure
Reset

Customer concentration · by provider · filtered

Soluna5 contracts
— · 248 MWtop customer 81%
  • Metrobloks200 MW
  • Undisclosed48 MW
  • Atlas Cloud1×
  • Fluidstack1×

Disclosures · 5

FiledProviderCustomerKindSiteMWGPUsTermTotal valueAnnualStatusSource
May 18, 2026SolunaMetrobloksOtherKati 2100 MW————Amendedverified8-K
excerpt
Soluna partnered with Metrobloks to unlock 100+ MW of AI and HPC capacity, secured 500+ acres of additional land, advanced Phase 1 to 30% schematic design, and began procurement of long-lead equipment for the up to 300 MW+ site.
Report an issue with this row
Mar 30, 2026Soluna Holdings, Inc.MetrobloksOtherProject Kati 2100 MW————Amendedauto 0.68-K
excerpt
In 2025, the Company signed an MOU with Metrobloks for an initial 100+ MW critical IT development, with a roadmap to expand to over 300 MW.
Report an issue with this row
Jan 8, 2025Soluna Holdings, Inc.Atlas CloudGPU cloud capacity——64———Expandedverified8-K
excerpt · extension terms
AI Deal Signed with Atlas Cloud: Soluna will provide Atlas with 64 Nvidia H100 GPUs and potentially scale to more to support Atlas' advanced AI video processing workloads. ... 128 additional H100 GPUs are slated for a new serverless offering with Atlas Cloud. We are negotiating terms.

Extension: potentially scale to more

Report an issue with this row
Jan 8, 2025Soluna Holdings, Inc.FluidstackGPU cloud capacityProject Ada—512———Amendedverified8-K
excerpt
Fluidstack signed a Letter of Intent to reserve 512 H100 GPUs by the end of January or early February.
Report an issue with this row
Jul 24, 2024Soluna Digital, Inc. (as the Developer) and Soluna DVSL II ComputeCo, LLC (as the special purpose vehicle)UndisclosedOtherBriscoe County, TX at 9981 Co Rd F, Silverton TX 7925748 MW————Definitiveauto 0.68-K
excerpt
On July 22, 2024 (the “Effective Date”) Soluna Holdings,Inc. (the “Company”) closed the financing on the Dorothy 2 project, where Soluna Digital, Inc. (as the “Developer”) and Soluna DVSL II ComputeCo, LLC (as the special purpose vehicle initially owned solely by the Developer, the “ComputeCo”) are collaborating on the development, design, procurement and construction of a 48 MW modular data center, owned by ComputeCo and operated by Soluna US Services, LLC, located in Briscoe County, TX at 9981 Co Rd F, Silverton TX 79257, and such data center may engage in cryptocurrency, batch processing, and other non-crypto related activities (the “DVSL II Facility”).
Report an issue with this row

Rows marked auto were extracted by a model and not yet reviewed; the excerpt under each row is the verbatim passage the figures came from. Confidence is the extractor's own estimate.