Contract Ledger

Every disclosed AI compute, colocation, hosting, power and equipment contract, one row per disclosure, read from the SEC filing it appeared in. Nulls mean the filing did not say. Nothing is estimated.

Contracts
3
3 from filings
Disclosed value
$0
sum of stated totals, live
Capacity
2.87 GW
sum of stated MW, live
GPUs
—
where a count was stated
Providers
2
parties delivering
Latest filing
Jun 22, 2026
most recent disclosure
Reset

Customer concentration · by provider · filtered

local utility2 contracts
— · 2.57 GWtop customer 78%
  • Digital Realty2.00 GW
  • Bitdeer Technologies Group570 MW
— · 300 MWtop customer 100%
  • Bitdeer Technologies Group300 MW

Disclosures · 3

FiledProviderCustomerKindSiteMWGPUsTermTotal valueAnnualStatusSource
Jun 22, 2026local utilityDigital RealtyPower supplyAstra Enterprise Park, De Soto, Kansas2.00 GW————Definitiveverified8-K
excerpt
To support development of the site, Digital Realty has entered into an Energy Service Agreement with the local utility to provide 600 megawatts of utility power by early 2028, rising to two gigawatts at full delivery.
Report an issue with this row
Jan 12, 2026a local utility companyBitdeer Technologies GroupPower supplyNiles, Ohio300 MW————Expandedauto 0.76-K
excerpt
Niles, Ohio – 300 MW grid-interconnected development site, with target energization date of Q4 2028. The project includes 41.8 acres of owned land and a transmission line extension agreement with a local utility company.
Report an issue with this row
Oct 15, 2025local utilityBitdeer Technologies GroupPower supplyClarington, Ohio570 MW————Amendedauto 0.76-K
excerpt
Clarington, Ohio – 570 MW under contract with local utility and will be available by end of Q3 2026. Power and data center infrastructure to be completed in Q2 2027.
Report an issue with this row

Rows marked auto were extracted by a model and not yet reviewed; the excerpt under each row is the verbatim passage the figures came from. Confidence is the extractor's own estimate.