Contract Ledger
Every disclosed AI compute, colocation, hosting, power and equipment contract, one row per disclosure, read from the SEC filing it appeared in. Nulls mean the filing did not say. Nothing is estimated.
Contracts
1
1 from filings
Disclosed value
$0
sum of stated totals, live
Capacity
4.25 GW
sum of stated MW, live
GPUs
—
where a count was stated
Providers
1
parties delivering
Latest filing
Aug 17, 2026
most recent disclosure
Customer concentration · by provider · filtered
Disclosures · 1
| Filed | Provider | Customer | Kind | Site | MW | GPUs | Term | Total value | Annual | Status | Source |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Aug 17, 2026 | SB Energy Corp. | OpenAI (affiliate of OpenAI Group PBC) | Colocation lease | PORTS-Pike Technology Campus (Portsmouth Site), Pike County, Ohio | 4.25 GW | — | 20 yr | — | — | Amendedverified | 8-K |
excerpt · extension termsSB Energy will build, own and operate the data center under a 20-year lease to OpenAI. ... OpenAI will utilize the capacity at the site. The AI factory will use NVIDIA's full-stack DSX AI factory platform, including GPUs, CPUs and networking. The initial deployment is designed to support 4.25 IT-GW of AI factory capacity. Extension: NVIDIA has the option to extend the opportunity at PORTS-Pike beyond the initial 4.25 IT-GW; OpenAI will be the customer for 8 IT-GW total. Report an issue with this row | |||||||||||
Rows marked auto were extracted by a model and not yet reviewed; the excerpt under each row is the verbatim passage the figures came from. Confidence is the extractor's own estimate.